Coverage under the NCG010000 permit must be renewed annually, if issued after April 1, 2019 until Notice of Termination is filed and approved.
Part 1A — Rainfall Data (inches)
Part 1B — Phase(s) of the Plan
Part 2 — Stormwater Plans & Controls
For each item, select Y / N / N/A. All "No" items should be referenced and corrected in Part 3A.
Part 2A: Storm Water Plans and Related Documents
Ref
Question
Yes
No
N/A
A
Is the approval letter or certificate, COC and a copy of the NPDES CGP on site? (Electronic CGP acceptable)
B
Is the approved plan on site and current?
Part 2B: Stormwater Pollutant Controls
Ref
Question
Yes
No
N/A
C
Are erosion and sediment controls shown on the approved plan installed and operating properly with no repairs needed?
D
Are stormwater controls shown on the approved plan installed and operating properly with no repairs needed?
E
Vehicle Tracking: Are construction entrances operating properly with no repairs needed?
F
Soil Stabilization: Are areas where construction activities have ceased properly stabilized within required timeframes?
G
Are earthen stockpiles stabilized or otherwise protected, and located at least 50 ft away or downhill from drain inlets and surface waters?
Report oil spills and releases of hazardous substances to the appropriate DEQ Regional Office within 24 hours of discovery.
Part 2C: Non-Storm Water Pollutant Controls
Ref
Question
Yes
No
N/A
H
Concrete, stucco, paint, etc. washouts: Installed, properly located, posted and operating with no repairs needed?
I
Solid & hazardous wastes: Are trash, debris, and hazardous materials properly managed?
J
Sanitary waste: Are portable toilets properly located and operating with no visible repairs needed?
K
Equipment and stored fluids: Are fuels, lubricants, hydraulic fluids, etc. contained so as not to enter surface and ground waters?
Report visible sedimentation into streams or wetlands to the appropriate DEQ Regional Office within 24 hours of discovery.
Part 2D: Sedimentation
Ref
Question
Yes
No
N/A
L
Are sediment or other pollutants noted beyond the approved/permitted limits of disturbance?
M
Are BMPs detected as releasing sediment or other pollutants into receiving waters?
Part 3A — Erosion & Sedimentation Control Measures
Inspect at least once per 7 calendar days and within 24 hours of ≥ 1.0" rainfall in 24 hours.
Measure ID / Location and Description
Reference(s)
Operating Properly? (Y/N)
Inspection Date
Describe Actions Needed
Date Previous Action(s) Observed as Corrected
—
Report unanticipated bypasses or non-compliance conditions that may endanger health or the environment to the appropriate DEQ Regional Office within 24 hours of discovery.
Part 3B — Stormwater Discharge Outfalls (SDOs)
Inspect at least once per 7 calendar days and within 24 hours of ≥ 1.0" rainfall in 24 hours.
Stormwater Discharge Outfall ID / Location
Any Visible Sedimentation in Streams/Wetlands/Outside Site Limits? (Y/N)
Any Increase in Stream Turbidity from Discharge? (Y/N)
Any Visible Erosion below SDO? (Y/N)
Any visible oil sheen / floating or suspended solids / discoloration? (Y/N)
Inspection Date
Describe Actions Needed
Date Previous Action(s) Observed as Corrected
—
Part 3C — Ground Stabilization
Must be recorded, at a minimum, after each phase. Add rows as needed.
Site area description and location where activities have temporarily or permanently ceased
Time Limit for Ground Cover
Have stabilization measures been installed? (Y/N)
Temporary or Permanent (T/P)
Is Ground Cover sufficient to restrain erosion? (Y/N)
Original Inspection Date
Describe Actions Needed
Date Previous Action(s) Observed as Corrected
—
Part 3D — New or Revised Measures
Document measures omitted/installed/altered/relocated/removed since last inspection. Add rows as needed. Corrective actions should be included in Part 3A.
Measure ID or Location and Description
Proposed Dimensions (ft.)
Actual Dimensions (ft.)
Significant Deviation from Plan? (Y/N)
Date measure observed as installed / altered / relocated / removed